Torre Agbar
Torre Agbar is a high-tech tower in the Poblenou neighbourhood of Barcelona, Spain. The 142 m tower was designed by Jean Nouvel and completed in 2005 at a cost of €130 million.
The bullet-shaped tower was designed to give the impression of land emerging out of the ground. Nouvel said of his design: "Unlike slender spires and bell towers that typically pierce the horizons of horizontal cities, this tower is a fluid mass that bursts through the ground like a geyser under permanent, calculated pressure."
The building is striking both for its conceptual design and its integration of bioclimatic architecture, and has been compared to Norman Foster’s Gherkin, which was finished a year earlier.
The tower is made up of two concentric concrete oval cylinders topped by a dome of glass and steel. It is covered with a façade of aluminium and glass in the form of 60,000 coloured strips. The inclinations and opacities of the glass provide the tower with numerous alterations of colour and tone.
A double glazing system regulates air flow and helps reduce the temperature of the building in hot weather.
The external lighting uses LED technology to enable image generation on the façade. Capable of creating 16 million colours, this system was described by its creator Yann Kersale, as 'diffraction'.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.